在线视频一本一区|手机看片日韩一区二区|无码高清电影在线观看免费|免费看美国一级黄片|国产伦理一区二区三区|日本欧美黄色日韩精品射精|久操视频高清免费|欧美日韩美女成人|无码欧美自拍99在线激情|国产无码影片成人射精视频

Baiyinhua No. 3 coal mine dry coal preparation plant, with a design capacity of 6.0mt/a, is built in an open pit, and it takes only 70 days from construction to operation. It is mainly used for the full size separation of residual coal and low calorific value coal in the pit. The calorific value of raw coal is 2958kcal / kg, and the calorific value of cleaned coal after separation is increased to 3524kcal / kg. Dry separation not only improves the calorific value of coal, but also reduces the stock of residual coal and reduces the risk of spontaneous combustion, which has brought huge economic and social benefits to the mine. It is also the largest underground dry coal preparation plant in the world.


ITEM

yield Wt%

ASH Ad% ??

Qnet,ar,Kcal/kg ? NET CALORIFIC VALUE Qnet,ar,Kcal/kg ??

RAW COAL

100

31.55

2937

CLEAN COAL

80.40

18.99

3524

REJECT

19.60

83.08

531


INNER MONGOLIA BAIYINHUA MENGDONG OPEN PIT COAL INDUSTRY CO., LTD

TIME: 2022-03-07
FOLLOW WITH OUR WECHAT,?
TO KNOW MORE ABOUT SHENZHOU GROUP.

PRICE? YIELD? MODEL? AFTER-SALE SERVICE? PEASE LEAVE A MESSAGE ONLINE, WE WILL REPLY TO YOU AS SOON AS POSSIBLE.

ONLINE MESSAGE